ABS and JB Energy Sign MOU to Support Floating Offshore Wind Development in Brazil
ABS and JB Energy have signed a memorandum of understanding (MOU) to collaborate on strategic studies for the proposed Aura Sul Wind Project, a floating offshore wind pilot under consideration in Rio Grande do Sul, Brazil.
ABS will support two key areas of the project: emissions reduction for the Port of Rio Grande and preliminary decommissioning strategy for JB Energy’s Raijin Float platform, a concrete-based, semi-submersible floating wind foundation.
“Floating offshore wind development depends on strong regional infrastructure and clear life-cycle planning from the outset. Through this collaboration with JB Energy, ABS will support studies that advance safe, sustainable and economically
Content Original Link:
" target="_blank">

