07
Fri, Feb

LD Tide picked to provide EMYN wind farm CTV

World Maritime

After an international tender, Siemens Gamesa has selected Louis Dreyfus Armateurs’ LD Tide joint venture with Tidal Transit to supply a crew transfer vessel (CTV) for the operation and maintenance services of

Written by Nick Blenkey
  • facebook
  • twitter
  • linkedin
  • email
  • print
EMYN wimd farm CTV

Photo © Louis Dreyfus Armateurs

After an international tender, Siemens Gamesa has selected Louis Dreyfus Armateurs’ LD Tide joint venture with Tidal Transit to supply a crew transfer vessel (CTV) for the operation and maintenance services of the Eoliennes en Mer des Îles d’Yeu et de Noirmoutier offshore wind farm (EMYN).

The new vessel is scheduled to start operations mid-2025.

The EMYN contract is the second awarded to LD Tide by Siemens Gamesa, with the CTV serving the first contract, named Acti’vent, operating at the Fécamp Offshore Wind Farm since October 2023.

The new vessel that will operate on the EMYN contract is one of two StratCat 27 CTVs currently being built for LD Tide by Singapore based Strategic Marine under a contract placed last year (see earlier story)

The StratCat 27 model is a high specification design. Accommodating 24 passengers, it prioritizes safety while also providing high performance and comfort on board, along with a robust

Content Original Link:

Read Full article form Original Source MARINELOG

" target="_blank">

Read Full article form Original Source MARINELOG

SILVER ADVERTISERS

BRONZE ADVERTISERS

Infomarine banners

Advertise in Maritime Directory

Publishers